- Depth: 6.5' to 10', two extensions
- one with pool coping.
- Foot Print: 45' by 70'.
- Coping: 180 lft of 2 3/8" scd
40 pipe with only 10' of total straight
- Concrete: 85 yards"
|
Click
on photos for a larger version

|
- Designed and Organized By: John
Casner
- Dirt Work: Brad Greene and many
other hands
- Concrete Work: Sam Batterson @ Breaking
Gound
- Steel Bending: Hooter @ StraightLine
Rails
Photo on Right: Opening day session
with the locals and the Wounded Knee crew November 4,
2005. Notice the corkscrew bends from the bowl to the
extenson, no relief cuts, heat or hammers were used to
blend these transitions. Click here for
larger image.
|
|